At those rates, an extra 20 square metres can represent $200,000 to $300,000 of construction cost.
β
Suddenly the question of whether you really need that extra living area becomes much more important than which basin mixer you choose.
β
That is why one of the first things we look at is whether every square metre is actually earning its keep.
β
Do you need two living rooms?
Could that fourth bedroom double as a study instead of sitting empty most of the time?
Can part of the existing house be retained rather than demolished and rebuilt?
Could a smarter plan give you the same outcome with less floor area?
β
This is also why we are increasingly using an Early Contractor Engagement, or ECI, process on our projects.
Rather than completing the design and only discovering what it costs when builders tender months later, we bring a trusted builder into the process much earlier.
We can test the design.
The builder can test the cost.
And the client can make informed decisions while those decisions are still relatively easy to change.
β
It does not mean designing purely around the cheapest solution.
It means knowing where the money is going while there is still time to decide whether it is worth spending.
β
Because good budgeting is rarely about making everything cheaper.
It is about making sure you are spending the money on the parts of the house that will actually improve the way you live.
β
And at $10,000 to $15,000 per square metre, the cheapest square metre is often the one you decide you never needed.
β
The Pre-design services below are the first step in that direction.